Wessex Water

Client: Wessex Water

Project: AMP5 & AMP6 Projects - Ongoing

Details:

Advanced are supplying the ecoNOMY® and EasyPIT® structural chamber systems to Wessex Water for both Repair & Maintenance and New Build projects.

Hinkley Point. Moorhouse Reservoir and ST Audries Bay Holiday Park are just a few of the sites that chambers have been installed on.

 

United Utilities

Client: United Utilities Plc

Project: AMP5 & AMP6 Projects - Ongoing

Details:
Advanced continue to supply the highly successful ecoNOMY® recycled plastic valve & hydrant chamber sections via United Utilities Tier 1 & 2 Frame Contractors.

The ecoNOMY® chambers are used in lieu of traditional concrete for Repair & Maintenance and New Build installations through-out the network.

 

Crossaig Sub-Station

Client: Bam Nuttall/Siemens JV

Project: Crossaig Sub-Station

Details:
Advanced were awarded the contract to supply the EasyPIT® and EasyPIT Connect® structural chamber systems to be used as cable drawpits to the Crossaig Sub-station project at Kintyre in Scotland.

Both 1200x1200mm EasyPIT® and 600x600mm EasyPIT Connect® were supplied with multi-part anti-skid composite covers to construct the cable chambers as part of the £148m power line project beneath the sea in Scotland.

 

Bedford Western Bypass

Client:  Bedford Borough Council

Project:  Bedford Western Bypass

Details:

Advanced were awarded a contract to supply the EasyPIT Connect® duct access chamber system and anti-skid composite covers to the final phase of the Bedford Western Bypass project.

To date we have supplied in excess of 900no 600x600x150mm EasyPIT Connect® chamber sections to this site with the scheme schedule for completion in 2016.

 

Beacon Barracks

Client: Defence Infrastructure Organisation

Project: Beacon Barracks Refurbishment - Stafford

Details:
Advanced have supplied the M.O.D approved EasyPIT® access chamber system to the £100m Beacon Barracks redevelopment.

In excess of 200no 1200x675mm D400 EasyPIT® chambers have been supplied to site via the Defence Infrastructure Organisations appointed main and sub-contract civil engineering partners.

 

Severn Trent Water

Client: Severn Trent Water

Project: Stoke Bardolph STW

Details:

Advanced supplied over 30no 750 x 750 x 1050mm D400 loading EasyPIT® access chambers to the Stoke Bardolph Sewage Treatment Works in Nottingham.

The chambers were installed throughout the site to be used as cable drawpits for the on-going upgrade of this site as part of Severn Trent Water’s AMP5 programme.

M.O.D Donnington

Client: Ministry of Defence

Contractor: Enterprise PLC

Project: M.O.D Donnington

Details:

Advanced supplied over 40 EasyPIT® access chambers together with galvanised mild steel access covers and frames to the M.O.D Donnington Logistics Centre in Telford, Shropshire.

The chambers in various depths ranging from 900mm to 1200mm were installed throughout the site as Drawpits as part of the cable renewal programme undertaken by Enterprise Power Services.

Cemex Surfacing

Client: Cemex Surfacing Ltd

Project: Cemex Railway Products Yard

Details: 

Advanced supplied 480 Mtrs of STORA-Drain Super F900 channel and gratings to the Cemex Surfacing yard in Saltley, Birmingham.

Cemex were resurfacing their yard for the storage and loading of the concrete railway sleepers at the Rail hub. Two runs were installed spanning the length of the yard which loads over 1 million sleepers per year.

Scottish Water

Client: Scottish Water

Project: Milesmark STW

Details:

Advanced were asked to supply the EasyPIT® access chamber system for use as wash out and air valve chambers on a new rising main and gravity sewer on a project in Dunfermline.

The EasyPIT® access chambers were supplied ready assembled so that site could simply place into the excavation, connect the pipework and backfill.

This project was part of Scottish Water’s on-going AMP5 programme of works.