M.O.D Donnington
Client: Ministry of Defence
Contractor: Enterprise PLC
Project: M.O.D Donnington
Details:
Advanced supplied over 40 EasyPIT® access chambers together with galvanised mild steel access covers and frames to the M.O.D Donnington Logistics Centre in Telford, Shropshire.
The chambers in various depths ranging from 900mm to 1200mm were installed throughout the site as Drawpits as part of the cable renewal programme undertaken by Enterprise Power Services.