Duct Chambers for ITV

Advanced have recently supplied their EasyPIT® LITE structural duct access chamber system and associated ductile iron manhole covers & frames to the new ITV studios, which is currently under construction at Media City in Manchester. Media City is a 200-acre mixed-use property development on the banks of the Manchester Ship Canal in Trafford.

Duct Chambers for A69 in Cumbria

Advanced have been awarded a contract to supply the duct access chambers for the A69 Lighting Scheme in Hatton, Cumbria. Following several weeks of design work and specification alterations with main contractor Colas Ltd and in conjunction with our merchant partners, Advanced will supply 1200x675mm and 750x675mm EasyPIT® LITE street lighting chambers as part of the MCX Type "A" and "B" chamber requirements.

Duct Chambers for new BMW PDI Facility

Advanced have commenced the supply of their EasyPIT® duct access chambers to the new £25 million BMW Pre-Delivery Inspecition facility in North Killingholme. The 6000 sq/m site will see in excess of 120no chambers of various depths being installed together with bespoke fabricated steel access covers & frames. Advanced worked closely with their merchant partners and Able UK and have shipped the first consignment direct to site within 24 hours of receiving the official purchase order.

Manhole Ladder for Royal Albert Hall

Advanced have recently supplied their EasyRISER® manhole ladder system to main contractor Sir Robert McAlpine who are working on a project to upgrade the heating and colling systems at the Grade 1 listed Royal Albert Hall in South Kensington. The 6MTR EasyRISER® ladder in grey was supplied on a next day delivery service, something which cannot be achieved when using steel alternatives.

F900 Chambers for Stansted Airport

Advanced have recently supplied their EasyPIT© F900 loading access chamber together with F900 ductile iron access covers and frames to a project at Stansted Airport. Having worked closely with the design team and main contractor, both plain and pre-drilled chambers were supplied as part of the ongoing infrastructure work.

Website by Clickingmad