EasyPIT® Connect Duct Chambers for United Utilities

We are currently supplying our EasyPIT® Connect structural duct chambers to Bury Water Treatment Works, as part of United Utilities' ongoing AMP6 Programme.

The AMP6 contract is a design and construct framework for the next capital investment period, from 2015 to 2020 and covers the full spectrum of works for both water and waste water across the North West England geographic area for which United Utilities is responsible. The contract could be further extended to 2026. 

 

Duct Chambers for Morpeth Bypass

Advanced continue to supply duct chambers to main contractor Carillion, for work on the Morpeth Northern Bypass Scheme.

The Morpeth Northern Bypass will release the town from rush hour gridlock and open up this part of the county to increased business development, economic regeneration and potential inward investment, further supported by the upgrading of the A1 through the county.

Duct chambers for Waste Water Treatment Works

We have recently supplied contractor JN Bentley with our 600x600mm EasyPIT® Connect and EasyPIT® Lite Duct chambers for a project at Five Fords Waste Water Treatment Works in Wrexham for Dee Valley Water.

The EasyPIT Connect® 100% recycled plastic duct access chamber system has been designed to provide an environmentally friendly alternative to traditional brick built duct access chambers and rotationally moulded liner systems.

Composite covers for Met Office

We have supplied 1200x1200mm 4 Part Composite covers and galvanised frames to contractor Dancourt for a project at the Met Office in Exeter.

Supplied complete with galvanised steel rising frames, composite covers offer superior slip resistance, no inherent scrap value and fall below one man lift operation guidelines.

Hydrant chambers for Thames Water

We have supplied our 430x280x150mm ecoNOMY®  Hydrant Chambers to Costain Group for a project at Beddington Sewage Treatment Works in Croydon for Thames Water.

The ecoNOMY® range has been developed specifically for the utilities sector as a direct alternative to traditional concrete products.

Manufactured from 100% recycled post industrial PVC, our chambers have been independently tested to BSEN124 D400 loadings for footway and highway installations and are UK manufactured in both 75mm and 150mm depth increments.

 