Duct Access Chambers at DP World Project

The EasyPIT® structural duct access chamber system has been used on the DP World/London Gateway project in Essex by contractor VolkerFitzpatrick. The 4050x3000mm D400 loading chambers have been used as LV Cable Drawpits and over 20no will be installed over this prestigious development together with bespoke access covers & frames designed specifically for the ABC EasyPIT® chamber system.

Crossaig Substation - SSE

ABC have recently supplied their EasyPIT® and EasyPIT Connect® duct access chamber systems to the Crossaig Substation project in Scotland. Bam Nutall Ltd/Seimens have installed the drawpit chambers on the new electricity substation being constructed as part of the £148m power line project beneath the sea in Scotland.

Beacon Barracks - M.O.D Stafford

ABC are supplying the EasyPIT® duct access chamber system to the £100 million redevelopment of Beacon Barracks at M.O.D Stafford.

The main barracks redevelopment will help accomodate two new signal regiments returning from Germany. The site will see approximately 500no EasyPIT® chambers installed during the course of the project with the majority being used as cable drawpits.

Severn Trent Water continue to use EasyRISER®

The EasyRISER® modular manhole ladder system continues to be used by Severn Trent Water and their framework contractors as a direct alternative to galvanised and stainless steel ladders.

A recent project undertaken by NMC Nomenca in Fosse Park, Leicester again highlighted just how effective the EasyRISER® system is in reducing costs not only per unit but also lead and installation times together with whole of life costs.

20140530 121753

Northumbrian Water install EasyPIT® Access Chambers

ABC have recently supplied the EasyPIT® duct access chamber system to a project in Chester Le Street for Northumbrian Water.

Working with the main contractor, Bam Nuttall, ABC designed and supplied the bespoke EasyPIT® chambers ready assembled with pre-drilled duct entries so that the team on site could simply place in the excavation, connect the duct to the chamber and back-fill.